Emley Moor transmitting station
Emley Moor transmitting station, officially known as The Arqiva Tower, is a telecommunications and broadcasting facility on Emley Moor, in Kirklees, West Yorkshire.
With a height of 330.4 m (1,084 ft), it is the tallest freestanding structure in the UK, the seventh tallest in the European Union, and the 24th tallest tower in the world. It is 20.8 m taller than The Shard, which is popularly thought to be the tallest structure in the UK.
Designed by Arup, the structure consists of a tapered cylindrical pillar of reinforced concrete, topped by a steel lattice mast carrying 55 m (180 ft) tall antennas.
The current tower is the third such structure to have occupied the site. The original lattice tower was built in 1956 and measured 135 m (443 ft) tall. It was used to broadcast ITV to the Yorkshire area. In 1964, it was replaced by a guyed mast measuring 385.5 m (1,265 ft).
In March 1969, the structure collapsed as a result of strong winds and the weight of ice that had formed around the top of the mast and on the guy wires. The subsequent committee of inquiry blamed the collapse on a form of oscillation which occurred at a low but steady wind speed.
The construction of the current tower was begun in 1969 and was completed in 1971. It is built on foundations which extend 6 m (20 ft) into the ground. A control room at 274 m (900 ft) can be reached by a lift that takes around 7 minutes to ascend.
In 2002, English Heritage (now Historic England) granted the tower Grade II listed building status due to its ‘significant architectural or historic interest’.
In recent years, the tower has had supporting structures attached to accommodate more dishes and aerials, reflecting the changing nature of communications and technology.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.